Residences
TRUBARJEV KVART LJUBLJANA
Floor area of residences and underground parking lot: ~15.000 m2
Mechanical: CAV (Constant Air Volume) individual ventilation systems for residences and central ventilation system for parking lot. Central heating system using Radiators with District/Building Interconnections. Pre-installation for Split Air-Conditioning per residence
Plumbing: Potable cold and hot water supply with various fixtures and sanitary waste water sewer
Life Safety System: Fire Hose System and Smoke Management
Role & Responsibilities: Designing, Commissioning
PSO DORNBERK
Floor area of residences: ~1.650 m2
Mechanical: CAV (Constant Air Volume) individual ventilation systems and heating systems using individual central Gas Boilers with Radiators per residence. Pre-installation for Split Air-Conditioning per residence
Plumbing: Potable cold and hot water supply with various fixtures and sanitary waste water sewer
Life Safety System: Fire Hose System
Role & Responsibilities: Designing
______________________________________________________________________________________
NEW DORMITORY, AVIANO AIR BASE
Floor area: ~4.700 m2
Mechanical: The air side mechanical systems consist of four AHUs, to handle all outside air to VAV (Variable Air Volume) boxes with reheat. Air-Cooled Chiller with heat recovery and Condensing Gas Boiler represent a source of cooling and heating energy. For service water pre-heating also solar panels system is integrated
Plumbing: Potable cold and hot water supply with various fixtures and sanitary waste water sewer
Certification goal: LEED Silver
Role & Responsibilities: Commissioning